downloadGroupGroupnoun_press release_995423_000000 copyGroupnoun_Feed_96767_000000Group 19noun_pictures_1817522_000000Member company iconResource item iconStore item iconGroup 19Group 19noun_Photo_2085192_000000 Copynoun_presentation_2096081_000000Group 19Group Copy 7noun_webinar_692730_000000Path
Skip to main content

A Critical Subsystem Supplier’s Response to COVID-19: Interview with President of HORIBA STEC

Semiconductor equipment spending is mounting a strong recovery on the strength of explosive chip demand for work-at-home and study-at-home electronics fueled by the COVID-19 pandemic. Despite the growth, the 2017-2018 memory boon that triggered a critical subsystems shortage is still fresh on the...

Sandia Ensures Sustainable Future with Fab Upgrade

Sandia National Laboratories just finished updating equipment in its microelectronics fab, marking the completion of the first phase of a 3-year fab upgrade program. The transition from 6-inch to 8-inch wafer sizes will align the Department of Energy national lab with industry standards to ensure...

Automated Material Handling for Semiconductor Assembly and Test

OSATs (outsourced assembly and test companies) currently handle the bulk of assembly and test activity for the worldwide semiconductor industry. These companies’ factories have a manual operation legacy: Decision-making is manual. Materials and WIP (work in process) movement is manual. Practically...